Intermediate Named Sub-Contract Conditions (ICSub/NAM/C)
JCT 05
- Author:
- Joint Contracts Tribunal (JCT) [?ProductPublisher:?]
Appropriate:
-
for use where the main contract is the Intermediate Building Contract or Intermediate Building Contract with contractor's design; and
-
where the Sub-Contractor is Named to carry out sub-contract works, whether or not they include design.
Can be used:
-
where the sub-contract works and/or main contract works are to be carried out in sections;
-
for sub-contract works that are to be carried out on the basis of an adjusted sub-contract sum (adjustment for variations etc.).
Not suitable:
-
unless the Sub-Contractor is not Named.
-
for any sub-contract work that forms a part of the Contractor's Designed Portion.
Extent | N/A | Sub. No. | |
---|---|---|---|
Size | A4 | Price | [?DiscountedPrice:?] |
Format | Paperback | ||
Availability | [?AvailabilityAlt:?] | Delivery | Delivery options and charges |