Intermediate Named Sub-Contract Conditions (ICSub/NAM/C)

JCT 05

Author:
Joint Contracts Tribunal (JCT)
[?ProductPublisher:?]
Price: [?DiscountedPrice:?]

Appropriate:

  • for use where the main contract is the Intermediate Building Contract or Intermediate Building Contract with contractor's design; and

  • where the Sub-Contractor is Named to carry out sub-contract works, whether or not they include design.

Can be used:

  • where the sub-contract works and/or main contract works are to be carried out in sections;

  • for sub-contract works that are to be carried out on the basis of an adjusted sub-contract sum (adjustment for variations etc.).

Not suitable:

  • unless the Sub-Contractor is not Named.

  • for any sub-contract work that forms a part of the Contractor's Designed Portion.

Extent N/A Sub. No.
Size A4 Price [?DiscountedPrice:?]
Format Paperback    
Availability [?AvailabilityAlt:?] Delivery Delivery options and charges