Intermediate Sub-Contract Conditions (ICSub/C)

JCT 05

Author:
Joint Contracts Tribunal (JCT)
[?ProductPublisher:?]
Price: [?DiscountedPrice:?]

Appropriate:

  • for use where the main contract is the Intermediate Building Contract; and

  • for sub-contract works where the Sub-Contractor is not required to design.

Can be used:

  • where the sub-contract works and/or main contract works are to be carried out in sections;

  • for sub-contract works that are to be carried out on the basis of an adjusted sub-contract sum (adjustment for variations etc.) or by complete re-measurement;

  • where main contract is the Intermediate Building Contract with contractor's design if the Sub-Contractor is not required to design.

Not suitable:

  • where the Sub-Contractor is to design any part of the sub-contract works, even though the other criteria are met - consider the Intermediate Sub-Contract with sub-contractor's design (ICSub/D);

  • where the Sub-Contractor is Named in the main contract.

Extent N/A Sub. No.
Size A4 Price [?DiscountedPrice:?]
Format Paperback    
Availability [?AvailabilityAlt:?] Delivery Delivery options and charges